FAST MOUNTING
WITH EXTENDED INSTALLATION SPACE
FAST MOUNTING
WITH EXTENDED INSTALLATION SPACE
CEILING JUNCTION BOX FOR PREFABRICATED CONCRETE
A classic in the fabrication of precast slabs! The universal junction box can be used as a ceiling junction box and offers the electrician extended installation space. Thanks to the clever mounting technology using a magent, you deliver your clients high-quality products in a minimum of time. See for yourself.
The universal junction box
in action!
The magnet technology offers precast factories great advantages. The installation on the formwork is simplified and bothersome removal of glue residue after concreting is no longer necassary. After the precast slab has been lifted, the magnets remain on the formwork and thus can be used again immediately.
With an installation depth of 111 mm the universal junction box offers a lot of space for all kinds of installation work. The integrated holder for a self-tapping ceiling hook according to DIN EN 60670 facilitates the installation of ceiling lamps for the electrician on the construction site. If required, the universal junction box can also be used as an electronics box.
Further technical information can be taken from the data sheets:
SIMPLE INSTALLATION
IN A FEW STEPS
Place universal junction box with hot glue or automatically with the magent.
Reinforcement is being installed.
After concreting the magnets remain on the formwork and can be used again.
Unscrew cover of the universal junction box.
Open conduit entries with a plie.
Install up to eight conduits M20/M25.
Screw cover back on, install reinforcement and concrete.
After concreting open universal junction box easily with a hammer blow.
Use integrated holder for a ceiling hook and complete installation.
FURTHER SOLUTIONS FOR
CONCRETE INSTALLATION IN PRECAST FACTORIES
WE ARE THERE
FOR YOU
Hotline
+49 8638 88559-200
Ask our experts
To the Primo expert chat
E-Mail
info@primo-gmbh.com