ONE MEMBRANE BOX
FOR THE ENTIRE BUILDING SITE
ONE MEMBRANE BOX
FOR THE ENTIRE BUILDING SITE
M-SERIES CONCRETE BOXES
The material battle on the construction site has an end! With the concrete boxes from the M-Series, you have a genuine all-rounder in your assortment. The M1, M2 and M3 membrane boxes impress with multiple application possibilities and uncomplicated installation. That saves nerves, time and money. Thanks to the modern membrane technology, the boxes are absolutely concrete-tight and the conduit grip ensures reliable strain relief. See for yourself.
IN ACTION!
The concrete boxes from the M-Series are available in three different sizes and are thus variably usable:
All variants are available with a 60 mm or 35 mm installation opening, are 100 percent airtight and can be used for a concrete cover of 20 – 60 mm. The polypropylene membrane boxes are heat-resistant from -5 °C to 100 °C. Due to the smart design, the following areas of application are possible:
Further technical information can be taken from the data sheets.
SIMPLE INSTALLATION
IN A FEW STEPS
Option 1: Attach the cover of the membrane box to the wall (l) or the ceiling (r) in the marked place with nails. If the reinforcement has already been installed, the Primo Nailer helps with simple and injury-free fastening. The wall and ceiling mounting processes are identical.
Option 2: Attach membrane boxes directly to the reinforcement with the help of the optional wings.
Thanks to SCS connection technology, a second concrete box can easily be installed at a standardised distance of 71 mm.
Connect two membrane boxes together simply and stably thanks to SCS connection technology and place them on the fastened covers.
Cut the membrane with a cutter knife.
Insert conduits as desired without additional tools.
Attach the second reinforcement and concrete.
Tap in the covers after concreting.
Remove the SCS connection web effortlessly with the Primo Box Cutter.
Install pre-wired devices.
Complete the installation.
ACCESSORIES FOR
THE M-SERIES
PUSH-ON FRAME
Our Push-on Frames are also used in the electrical installation for the fastening of the membrane box M1. You can order them as accessories. This allows you to increase the height of the actual box by 2.5 cm: the installation space is extended and fastening is facilitated. Furthermore, you have the option to combine any number of Push-on Frames. So you can adapt the system entirely in accordance with your needs.
WINGS
The membrane boxes are attached directly to the steel reinforcement with the help of the Wings. Neither a counter bearing nor a support element is required for fastening. Due to the special design of the Wings, the standard distance to door formwork of 15 cm is maintained. Depending on the direction of the attachment of the wings to the membrane box, a concrete cover of 20-40 mm or, with a rotation of 180°, of 40-60 mm is possible.
NAILER
The nailing aid for concrete construction products facilitates the fastening of boxes. Without finger injuries, the 40 cm Primo Nailer nails the cover and the boxes to the formwork – even if the second reinforcement has already been installed. The distance between the pick-up pins is 60 mm, so that any standard box cover can be picked up, precisely positioned and nailed down. The mounted magnet that picks up the nails can be reordered.
Further Solutions for
CONCRETE INSTALLATION
WE ARE
THERE FOR YOU
Hotline
+49 8638 88559-200
Ask our experts
To the Primo expert chat
E-Mail
info@primo-gmbh.com